Bathroom 1

The bathroom is at the halfway stage of being converted, after a week's work by Absolute Mobility of Henley. Last Monday they completely gutted it. Since then they've been strengthening the floor, redoing the plumbing and electrics and plastering walls and ceiling. They've covered the floorboards with thin plywood.

You can see from the photo that they've left it clean and tidy, as they do at the end of each day. I'm very pleased with their whole approach to tackling this job. They know what they are doing, get on with it with a will and do so cheerfully.

Martin and Errol say that they are looking forward to making it pretty during next week.