Lift Preparations

Preparatory works for the wheelchair lift were completed this morning.  

Last Wednesday, two very hard working chaps did the main work, lifting floorboards upstairs, cutting away joists, fitting a long metal plate to strengthen a remaining joist and rerouting pipework.  They also installed a new electric circuit from the main distribution box to power the lift. They opened all doors and windows and made a big racket. I didn't get home until midday, so only witnessed the final hour or so.




Today a specialist asbestos removal firm removed the final layer of plaster. It seemed overkill, but at least all the dust was well contained and didn't spread around the house. The chap had to cut through the lath and plaster ceiling, together with its artex paint which contained asbestos.